How Long Does It Take to Make a 90-Minute Movie?
How Long Does It Take to Make a 90-Minute Movie?
Creating a 90-minute movie can be a lengthy and complex process that often spans several years. Factors such as the genre, location, and complexity of the film significantly impact the duration of its production. In this article, we will explore the different phases of movie production and the typical timeframes involved, ranging from four to seven years for animated films.
Understanding the Production Timeline
While pre and post-production phases are generally of similar duration, the overall production period can range from as little as four years to as much as seven years, depending on the specific circumstances. This timeline includes development, pre-production, production, and post-production stages, each contributing to the final product.
Factors Influencing the Production Timeframe
The length of the intended film is less critical than its genre, locations, and the level of complexity. For instance, an emotionally charged drama with a minimal cast could be completed in as few as 18 days of production, whereas an action movie with a large cast and multiple locations might require more than 20 weeks. Here are some specific examples:
Short Production Time Example: Emotional Drama
A two and a half hour emotional drama set in one or two locations with a small cast could be filmed in about 18 days. This fast-paced production might be shot on a sound stage, allowing for controlled and efficient filming. The development, pre-production, and post-production phases for such a project might take around a year, from start to release.
Long Production Time Example: Action Movie
An 88-minute action movie with numerous locations and a large cast might take significantly longer to produce. Due to the extensive set designs, complex stunts, and intricate camera work, shooting this film could take more than 20 weeks. The pre-production and post-production phases would likely add several months or even a year to the process.
Getting Specific with Larger Budget Studio Films
For commercial, larger budget studio films, the production process can take between two and three years. This extended timeframe is commonly seen in major productions where development, pre-production, and post-production phases are meticulously planned and executed.
Typical Timeline Breakdown
- Development: This phase involves story development, pitching, and securing financing. It can take anywhere from 6 months to a year or more, depending on the complexity of the project and the success of pitching.
- Pre-Production: Pre-production includes scriptwriting, casting, location scouting, and the creation of detailed plans such as the production schedule and budget. This stage can last from several months to a year or more.
- Production: Actual filming can take several weeks to a couple of months, depending on the length of the film and the complexity of the scenes. For a 90-minute action movie, this could be 6 to 12 weeks.
- Post-Production: This phase involves editing, special effects, sound design, and finalizing the film. Post-production can take several months, especially if the film is complex and relies heavily on visual effects.
Conclusion
In summary, the production of a 90-minute movie can vary greatly depending on numerous factors. While some projects might be completed in as little as 18 days, most larger budget studio films can take up to two and a half years from development to post-production. Understanding these various stages and their timelines is crucial for successful completion of any film project.